Tuesday, January 24, 2012

Link files in Navisworks Manage and see them in Navisworks Freedom

Link Documents in Navisworks Manage and look the same in Navisworks Freedom for Facility Management.

Keep the files together in one folder, as shown,





Open nwc file, select the object, right click in the properties tab, as shown below, select Edit Links….










This will open Edit Links window, in this hit Add tab,











This will open Add Link window, under this give name and hit browse tab to link file,













In window Choose Link select All for Files of type, this will make you see the required file,














Select the file, hit open; hit Ok of for Add Link and Edit Links windows

Save the file in nwd format so that you can open this in Freedom viewer,
Open the file in Freedom viewer,
Select Link tab, in Home tab








This will show you below link in model, by clicking on this the document will open.
















Enjoy Linking file in Navisworks.

Monday, January 23, 2012

COBie Toolkit For Revit 2012

The COBie Toolkit produces COBie v2 deliverables in conjunction with Revit model development. The template provides a non-automated means to capture COBie development in Revit, export data to a text file, and facilitate eventual intake into spreadsheets. The development of a data-rich BIM model for eventual FM handover necessitates grounded discussions and planning amongst the project team. The realm of digital, non-graphic data development and delivery in the AEC process is new and developing, and will evolve and mature considerably in the next few years. COBie is a general framework for data exchange or delivery. Each project must tailor its goals for the resources and requirements of the project, and for the continuing lifecycle needs and capabilities of the owner/operator.
The toolkit is available for download on the Autodesk Resources website.

Thursday, January 19, 2012

10 Truths about BIM (Building Information Modeling)

1 BIM takes design to the next level.
Technological developments open up new avenues for design, and BIM is no exception. The 3D function enables complex shapes and the software’s ability to handle sophisticated calculations will allow structural engineers to push the boundaries with ever more daring designs.

2 The ‘I’ is more important than the ‘B’.
Pretty pictures might impress, but it is as an information management tool that BIM software really shines. One reason for the slow take-up of BIM in the civil engineering sector is that the BIM community has so far focused on ‘building’ to the detriment of ‘information’.

3 The colour of BIM is green.
Using it properly will cut project time and thereby energy use, as well as cost. BIM will reduce the waste of materials during construction and building management and eventually assist in sustainable demolition. Energy modelling can also minimize energy use over a building’s life.

4 BIM will destabilise the construction industry.
Unlike CAD, which computerized a single activity while leaving macro processes largely intact, BIM will change everything. There’s no point attempting to implement BIM software throughout the industry with the expectation that things won’t change. They will.

5 Governments must take the lead.
The benefits of working the BIM way only come with close collaboration. If one member of a project team is using BIM while the others continue doing things the old way, there will be limited benefit. To make the investment worthwhile, someone has to break the stalemate. That someone is often the government.


6 Companies must work together as one.
Firms and disciplines working separately, interacting only through the exchange of construction documents just won’t do any more. BIM both enables and requires tighter integration.


7 Both the software and the professionals must work together.
But simply working together isn’t enough – habits and routines have to be aligned in order to make cooperation natural. The software will need to be developed to allow seamless integration, and so will the attitudes of professionals.

8 New contracts will emerge.
Both digitalisation and close collaboration challenge the prevailing system of intellectual ownership. There are two possible development routes. One is increased specialisation where ownership resides with modelling specialists. The other is consolidation into giant firms, as companies work increasingly closely, solving ownership issues.

9 The software platform is at a crossroads.
The fight for supremacy in the software world rages on. Depending on the outcome of current power struggles, the digital environment in the new construction industry will conform to one of three types: open standard, closed and proprietary standard, or no/several standards.

10 BIM will become the DNA of future construction.
When the system is sufficiently streamlined we can start to focus on using it. Once the basic information infrastructure is in place and we’ve learned to work with it, numerous technologies, in use or in the pipeline, can be brought in.

Original Post– http://www.wspgroup.com/en/wsp-group-bim/10-truth-bim/